to help me judge which projects were most important or needed the most attention is the “triple constraint,” or a triangle with three equilateral sides. Each side represents the cost of the project, the scope of the project, and the time required to complete the project. None of the sides can be adjusted without making changes to the other two... - http://tumblr.elnostreraco.com/post...